Rogers Corporation – Rogers, CT

Scope of Work​

• Installation of about 500 feet of a cofferdam system to retain river water from excavations.

• The removal and disposal of about 2,500 tons of asbestos impacted soil and 1,800 tons of VOC impacted material from the riverbed and bank.

• Restoration of a part of the bank with a geotextile fabric and 18-inch armor stone and capping of the remaining bank with a LLDPE liner and armor stone.

• Site restoration including paving and hydroseeding of grassed areas.

Client

Rogers Corporation

Duration​

Month 2020 – Month 2020

Value

$1,200,000

Location

Rogers, CT