Scope of Work
• Installation of about 500 feet of a cofferdam system to retain river water from excavations.
• The removal and disposal of about 2,500 tons of asbestos impacted soil and 1,800 tons of VOC impacted material from the riverbed and bank.
• Restoration of a part of the bank with a geotextile fabric and 18-inch armor stone and capping of the remaining bank with a LLDPE liner and armor stone.
• Site restoration including paving and hydroseeding of grassed areas.
Client
Rogers Corporation
Duration
Month 2020 – Month 2020
Value
$1,200,000
Location
Rogers, CT